Our Maritime Business Magazines

  

Bakker Sliedrecht Responsible for Electrical Installations for Anthony Veder Ice Class LNG Tanker


impression-of-the-super-1a-ice-class-lng-tankerBakker Sliedrecht obtained the order from Neptun Werft in Rostock to take care of all electrical installations for a new LNG tanker with a LNG loading capacity of 18000 m3.

Bakker Sliedrecht will engineer, install and commission all electrical installations for the tanker, with an exception of the gas installations.

The scope for Bakker Sliedrecht contains amongst other things the main low voltage switchboards, navigation and communication systems and an alarm and monitoring system including power management, ballast control and tank monitoring.

The tanker is scheduled for delivery to Anthony Veder by the end of 2017.